< Back to full list

Unistress Building Construction Ltd

Contract No : SS K518 – A 24-classroom primary school

  • Using product with Grade 1 energy label
  • Using of LED lighting
  • Maintaining indoor temperature at 24-26 degree Celsius
  • Set computer turn to standby mode when not using a period of time
  • Close all the electrical devices during non-office hours
United Christian Hospital
  • Arrange shuttle bus service for inter cluster hospital
  • Switch off partial lighting & air-conditioning in public area after office hour
  • Shut off lift service in night time
  • Using T5/T8 electronic ballast lighting
  • LED bedhead lighting
  • Reduce food waste for patient (e.g. default small size of meal for prenatal ward & postnatal ward)
  • Introduce low-carbon meal for patient
  • Adopt BEAMS plus certificate standard for hospital expansion project
  • Organize recycling programmes (e.g. paper, plastic bottles, cans….)
Urban Property Management Ltd